New Metal Roof, new Metal Siding 75% of the home, New Windows, newly remodeled downstairs bathroom in 2025, New flooring throughout the home, New main sewer line to house 2024, All lines for a mini split have been installed 2025 just needs unit, New Drywall, Installation, Wiring and Breaker box 2025. AS IS Where Is