About Tom McHugh Construction
Tom Mchugh Construction proudly offer the option to build and finance the construction loan portion of a new home, allowing buyers to purchase the property as soon as it's complete. This option is available on most of their lots.
The current turnaround time for a turnkey build is approximately five months from the time of contract and deposit. This timeline includes floor plan design, permitting, and material procurement, with actual construction taking around three months.
They also work with trusted lenders who provide a 12-month rate lock on a 30-year fixed loan, secured at the time of deposit.
Actively Selling Markets
Appleton
1 Community
Green Bay
1 Community Avg $362K
Oshkosh-Neenah
1 Community
All Communities by Tom McHugh Construction
Newest Communities by Tom McHugh Construction
Contact Tom McHugh Construction
- 0 N Mayflower Dr
- 5529 W Brookview Dr
- 5433 Brookview Dr
- 4741 Westbrook Ct
- 4761 Westbrook Ct
- 4763 Westbrook Ct
- 4607 W Capitol Dr
- 4065 Hegner Farm Ct
- 1703 N Casaloma Dr
- 4499 W Trasino Way
- 0 Integrity Way
- 4190 N Rose Meadow Ln
- N1224 Bobwhite Dr
- W6181 Sherwood Point Dr
- 4873 W Jack Pine Ct
- W6220 Sherwood Point Ct
- N1734 Hot Springs Ct
- W6423 Boonesborough Dr
- W6569 Rickey Ln
- W6423 Rocky Mountain Dr
- 3225 N Abendroth St
- 0 Packard Unit 50318784
- N1765 Waterlefe Dr
- N1766 Waterlefe Dr
- N1842 Schroeder Farm Dr
- W6678 Emerald Ct
- 3005 N Abendroth St
- N984 Glennview Dr
- N1579 Ridgeway Dr
- W6681 Charleen Ln
- 0 N Mayflower Dr
- 4761 Westbrook Ct
- 4763 Westbrook Ct
- 1703 N Casaloma Dr
- 0 Integrity Way
- 0 Packard Unit 50318784
- 0 Charleen Ln Unit 50325386
- W6886 Mcallister Dr
- 0 State Road 76
- N1737 Red Cardinal Dr
- 0 Meadow Park Dr Unit 50319983
- 0 Meadow Park Dr Unit 50319972
- 0 Meadow Park Dr Unit 50319976
- 0 Meadow Park Dr Unit 50319981
- 0 Municipal Dr Unit 50314551
- N1332 Meadow Park Dr
- N1340 Meadow Park Dr
- W6838 Goldfinch Dr
- 0 High Point Ln Unit 50319977
- 0 High Point Ln Unit 50319979