About Tom McHugh Construction
Tom Mchugh Construction proudly offer the option to build and finance the construction loan portion of a new home, allowing buyers to purchase the property as soon as it's complete. This option is available on most of their lots.
The current turnaround time for a turnkey build is approximately five months from the time of contract and deposit. This timeline includes floor plan design, permitting, and material procurement, with actual construction taking around three months.
They also work with trusted lenders who provide a 12-month rate lock on a 30-year fixed loan, secured at the time of deposit.
Actively Selling Markets
Appleton
6 Communities Avg $410K
Green Bay
1 Community Avg $362K
Oshkosh-Neenah
2 Communities
All Communities by Tom McHugh Construction
Newest Communities by Tom McHugh Construction
Contact Tom McHugh Construction
- 0 W Greenville Dr Unit 50329925
- 0 N Mayflower Dr
- 0 N Mayflower Dr
- 3400 N Mayflower Dr
- 3321 N Casaloma Dr Unit 65
- 3325 N Casaloma Dr Unit 40
- W6444 Greenville Dr
- 4521 W Capitol Dr
- 1703 N Casaloma Dr
- N1415 Greenwood Rd
- 3722 N Casaloma Dr
- 4499 W Trasino Way
- 4490 W Trasino Way
- W6267 Rocky Mountain Dr
- 4190 N Rose Meadow Ln
- N1320 Ellen Ln
- N1779 Swanee Cir
- 4704 Timber Row Unit 8
- W6127 Sherwood Point Dr
- W6196 Sherwood Point Dr
- 0 Ridgeway Dr Unit 50329802
- 0 Ridgeway Dr Unit 50329806
- 0 Ridgeway Dr Unit 50329794
- 0 Ridgeway Dr Unit 50329797
- 5825 Long Ct
- 380 S Mayflower Dr
- 5728 W Spencer St
- W6842 Mcallister Cir
- W6843 Mcallister Cir
- W6846 Mcallister Cir
- 3540 W Capitol Dr
- W6890 Mcallister Dr
- W6886 Mcallister Dr
- W6882 Mcallister Dr
- W6862 Mcallister Dr
- 0 State Road 76
- 0 Red Cardinal Dr Unit 50329894
- 0 Red Cardinal Dr Unit 50329892