3
Beds
2
Baths
1,960
Sq Ft
1
Acres
About This Home
This home is located at 0 Lucy Rd, Gantt, AL 36421. 0 Lucy Rd is a home located in Covington County with nearby schools including Straughn Elementary School, Straughn Middle School, and Straughn High School.
Create a Home Valuation Report for This Property
The Home Valuation Report is an in-depth analysis detailing your home's value as well as a comparison with similar homes in the area
Home Values in the Area
Average Home Value in this Area
Tax History Compared to Growth
Map
Nearby Homes
- 000 Lucy Rd
- 13960 Preston Dr
- 13530 Gantt Red Level Rd
- 13089 Rawls Ave
- 28423 Central St
- Lot 1 Sunshine Rd
- Lot 2 Sunshine Rd
- 29731 Hamner Rd
- 29472 Indian Springs Loop
- 00 Twin Oaks Rd
- 0 Twin Oaks Rd
- 00 Hagood Rd
- 29298 Valley of Shiloh Rd
- 29935 Twin Oaks Rd
- 00 Valley of Shiloh
- Lot 49 Sandy Landing Rd
- 14788 F M Jones Rd
- Lot 29 Meadow Lane Rd
- Lot 30 Meadow Lane Rd
- 12092 Gantt Red Level Rd
- 13538 Lucy Ln
- 13743 Lucy Rd
- 000 Powerhouse Rd
- 00 Powerhouse Rd
- 0 Able Ave
- 43215 Able Ave
- 13494 Able Ave
- 28860 Powerhouse Rd
- 28972 Central St
- 13446 Able Ave
- 28983 Central St
- 13483 Christine Ave
- 31775 Oakey Streak Rd
- 13420 Able Rd
- 13389 Able Ave
- 13436 Spaulding Ave
- 13498 Christine Ave
- 13369 Able Ave
- 13405 Spaulding Ave
- 29038 Twin View Ln