About Tom McHugh Construction
Tom Mchugh Construction proudly offer the option to build and finance the construction loan portion of a new home, allowing buyers to purchase the property as soon as it's complete. This option is available on most of their lots.
The current turnaround time for a turnkey build is approximately five months from the time of contract and deposit. This timeline includes floor plan design, permitting, and material procurement, with actual construction taking around three months.
They also work with trusted lenders who provide a 12-month rate lock on a 30-year fixed loan, secured at the time of deposit.
Actively Selling Markets
Appleton
1 Community
Green Bay
1 Community Avg $362K
Oshkosh-Neenah
1 Community
All Communities by Tom McHugh Construction
Newest Communities by Tom McHugh Construction
Contact Tom McHugh Construction
- 0 N Mayflower Dr
- 1935 Anita Ct
- 1933 Anita Ct
- 4745 Westbrook Ct
- 4761 Westbrook Ct
- 4763 Westbrook Ct
- N1322 Greenwood Rd
- 4065 Hegner Farm Ct
- 1703 N Casaloma Dr
- W6515 Greenville Dr
- N1443 Greenwood Rd
- 3722 N Casaloma Dr
- 0 Integrity Way
- 4190 N Rose Meadow Ln
- W6588 Talon Dr
- N1786 Swanee Cir
- N1340 Westgreen Dr
- 3330 N Casaloma Dr
- W6736 Green Willow Ln
- 0 Packard Unit 50318784
- 3225 N Abendroth St
- N1765 Waterlefe Dr
- N1766 Waterlefe Dr
- N1842 Schroeder Farm Dr
- N1901 Savannah Dr
- N1337 Fairwinds Dr
- 5358 Pennsylvania Ave
- W6180 Long Ct
- 3133 Selma Ct
- N1371 Fawn Ridge Ct
- 0 N Mayflower Dr
- 4761 Westbrook Ct
- 4763 Westbrook Ct
- 4065 Hegner Farm Ct
- 1703 N Casaloma Dr
- 0 Integrity Way
- 4190 N Rose Meadow Ln
- 0 Packard Unit 50318784
- 0 State Road 76
- N1737 Red Cardinal Dr
- 0 Meadow Park Dr Unit 50319983
- 0 Meadow Park Dr Unit 50319972
- 0 Meadow Park Dr Unit 50319976
- 0 Meadow Park Dr Unit 50319981
- 0 Municipal Dr Unit 50314551
- W6838 Goldfinch Dr
- 1308 Meadow Park Dr
- W6981 Ridgeline Trail
- 0 High Point Ln Unit 50319977
- 0 High Point Ln Unit 50319979